← Market

Feed In Tariff

EEG 2023 solar feed-in tariff or market-premium reference value by commissioning date (2023-01-01 to 2026-12-31) and size: Bundesnetzagentur rates per size bracket, weighted value per § 23c, payment end and rules on negative prices and the 60 % limit.

POST https://rechen.halowerk.com/v1/feed-in-tariff

0.003 USDC on Base · payTo 0x2880EdfFF13100677Bf97A3CBdF3Bc34771C4E5E

Status: verified · payable

Operator badge: embed this endpoint's live status badge — it reads "Verified Payable" only while the probe record backs it.

Settlement: direct to the seller's payTo — 0% HIVE402 take

Payment routes

Base · 0.003 USDC · payTo 0x2880EdfFF13100677Bf97A3CBdF3Bc34771C4E5E · via cdp · settles direct
{
  "commissioning_date": "2026-09-15",
  "installed_kwp": 9.8
}
{
  "limitations": [
    "Information computed by formula and statutory rules from the stated parameters; not legal, tax, funding or energy advice and no substitute for planning by a qualified professional.",
    "Rates from the Bundesnetzagentur tables; aggregation of installations (§ 24), tenant-electricity supplement, tender-based values above 1 MW and special solar installations are not determined.",
    "The planned Solarpaket I increase for 40 kW+ is not applied without state-aid approval (§ 101(1) EEG); VAT is not included (§ 23(2))."
  ],
  "result": {
    "brackets": [
      {
        "bracket": "up to 10 kW",
        "kw": 9.8,
        "rate_ct_per_kwh": 7.7,
        "share": 1
      }
    ],
    "commissioning_date": "2026-09-15",
    "feed_in_mode": "partial",
    "installed_kwp": 9.8,
    "legal_basis": {
      "checked": "2026-11-01",
      "norms": [
        "§ 21 EEG 2023",
        "§ 23c EEG 2023",
        "§ 25 EEG 2023",
        "§§ 48, 49, 51, 53 EEG 2023",
        "§ 9(2) EEG 2023"
      ],
      "parameters_valid": {
        "commissioning_from": "2026-08-01",
        "commissioning_to": "2026-12-31"
      },
      "sources": [
        "https://www.gesetze-im-internet.de/eeg_2014/",
        "https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Foerderung/start.html"
      ],
      "version": "EEG 2023 as last amended by Art. 23 of the Act of 18.12.2025 (BGBl. 2025 I Nr. 347); rates per BNetzA"
    },
    "location": "building",
    "notes": [
      "Commissioned from 2025-02-25: no payment for quarter hours with negative spot prices (§ 51(1) EEG); below 100 kW this applies only from the year after a smart meter is installed (§ 51(2) no. 1); the payment period is extended (§ 51a).",
      "Feed-in tariff installations below 100 kW commissioned from 2025-02-25 must limit the active power fed in at the grid connection point to 60 % of the installed capacity until a smart meter with control unit is installed and tested (§ 9(2) no. 2 b, no. 3, § 100(3b) EEG).",
      "Feed-in tariff = market-premium reference value minus 0.4 ct/kWh (§ 53(1) no. 2 EEG)."
    ],
    "payment_rule": "20 years, extended to 31 December of the 20th year (§ 25(1) EEG), plus any extension under § 51a",
    "payment_until": "2045-12-31",
    "period": {
      "from": "2026-08-01",
      "to": "2026-12-31"
    },
    "remuneration": "feed_in_tariff",
    "source": {
      "publisher": "Bundesnetzagentur",
      "retrieved": "2026-11-01",
      "table": "Bundesnetzagentur, EEG-Förderung und -Fördersätze, Tabelle VergSaetzeAug26bisDez26.xlsx (Blatt Solar), https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EEG_Foerderung/Archiv_VergSaetze/_DL/VergSaetzeAug26bisDez26.xlsx"
    },
    "value_ct_per_kwh": 7.7,
    "value_ct_per_kwh_exact": 7.7
  },
  "service": "feed-in-tariff",
  "status": "success"
}

Script Master Labs LLC · SDVOSB · Kinston, NC · Terms · Refunds · Privacy · Sellers · Contact

SML network: ScriptMasterLabs — the main site · SML Dual Market — the human store: human checkout, card & crypto · VA Ratings — VA disability ratings, free for veterans

Agent intel trust badge

Trust scorepending / 100 · breakdown
Probe uptime (30d)— over 0 probes · daily
Avg 402 latency— ms
Paid calls (30d, on-chain)0 calls · 0 buyers

How to call

POST https://rechen.halowerk.com/v1/feed-in-tariff · input in body · spec from live-challenge

Input schema
{
  "type": "object",
  "additionalProperties": false,
  "required": [
    "commissioning_date",
    "installed_kwp"
  ],
  "properties": {
    "commissioning_date": {
      "type": "string",
      "format": "date"
    },
    "installed_kwp": {
      "type": "number",
      "exclusiveMinimum": 0,
      "maximum": 1000
    },
    "location": {
      "type": "string",
      "enum": [
        "building",
        "other"
      ],
      "default": "building"
    },
    "feed_in_mode": {
      "type": "string",
      "enum": [
        "partial",
        "full"
      ],
      "default": "partial"
    },
    "remuneration": {
      "type": "string",
      "enum": [
        "feed_in_tariff",
        "market_premium"
      ],
      "default": "feed_in_tariff"
    },
    "annual_feed_in_kwh": {
      "type": "number",
      "minimum": 0,
      "maximum": 100000000
    }
  }
}
Output schema
{
  "type": "object"
}
curl -i -X POST 'https://rechen.halowerk.com/v1/feed-in-tariff' \
  -H 'content-type: application/json' -d '{"commissioning_date":"2026-09-15","installed_kwp":9.8}'

Agents: POST https://hive402.scriptmasterlabs.com/mcp → route_task / proxy_call · SDK /sdk/hive402.mjs

Try it (your wallet signs; HIVE402 never holds funds)